Bill of Material Plot Order by Detail (data from member BOM)
Tool summary :
Also see :
- Bill of material layout ( Home > Project Settings > Fabricator > )
- Detail Members (updates bills of material)
- Bill of Material Editor (for editing data that can appear on this report)
- Reports ( User and Site Options > Output > " Reports " > set where report is output)
- Report viewer (a good way to output a report)
page 1 | contents | home > reports > system reports > bill of material > | reports >
Report header (also see the example ) :
Report writer links are based on the data source fields for the Report Writer's Bill Report Of Details , which you can Open in the reports/SDS2 file folder. |
Piecemark: The piecemark ( member piecemark ) of the members described on this page of the report. Each Bill of Material Plot Order by Detail provides information about all members assigned this one piecemark.
Report Writer: BillOfMaterial.Piecemark
Fabricator: The name of the current Fabricator at the time this report was generated. To change to a different Fabricator , Home > press "fabname" > double-click the Fabricator you want.
Report Writer: CurrentLocation.Fabricator
Job: The name of the current Job at the time this report was generated.
The report includes materials only from the Job that is listed here.
Report Writer: CurrentLocation.Job
Report type: The type of report is "Plot Report."
Note: For a Bill of Material Report 1 by Detail , "Report 1" is listed. For a Bill of Material Report 2 by Detail , "Report 2" is listed. For a Bill of Material Report 3 by Detail , "Report 3" is listed.
Page number: The number of this page in the Bill of Material Plot Order by Detail . Since a separate report is generated for each member selected , a typical report is one page long.
page 1 | contents | home > reports > system reports > bill of material | reports > | top
Columns on the report (also see the example ) :
Setup: The " Plot Order " in Bill of Material Layout sets up which columns appear on this report. For a Bill of Material Report 1 by Detail , " Report 1 Order " is used instead of " Print Order ." For a Bill of Material Report 2 by Detail , " Report 2 Order " is used. For a Bill of Material Report 3 by Detail , " Report 3 Order " is used. |
Unit Quantity: The number of pieces of this submaterial required to fabricate any one member that has the piecemark being referenced.
A "Unit Quantity" column appears on this report when a " Print Order " is entered for " Unit Quantity " in Bill of Material Layout .
Report Writer: BillOfMaterial.UnitQuantity
Total Quantity: Either the total number of members under this piecemark if this line is the first line of a member detail's bill of material, or the total number of pieces of a particular submaterial required to fabricate the total number of members under this piecemark.
A "Total Quantity" column appears on this report when a " Print Order " is entered for " Total Quantity " in Bill of Material Layout .
Report Writer: BillOfMaterial.TotalQuantity
Description: Either the type of member (BEAM, COLUMN, etc.) if this line is the first line of a member detail's bill of material, or the section size that conventionally describes the material in the " Description " column of a submaterial line on the member bill of material.
Section naming conventions : || wide flange || W tee || channel || angle || tube || S_shape || S tee || plate || flat bar || |
A "Description" column appears on this report when a " Print Order " is entered for " Description " in Bill of Material Layout .
Report Writer: BillOfMaterial.Description
Piece Mark: The piecemark ( member piecemark ) of the members being referenced.
A "Piece Mark" column appears on this report when a " Print Order " is entered for " Piece Mark " in Bill of Material Layout .
Report Writer: BillOfMaterial.Piecemark
Length: The length of the piece of submaterial.
A "Length" column appears on this report when a " Print Order " is entered for " Length " in Bill of Material Layout .
Report Writer: BillOfMaterial.LengthDimension
Unit Weight: Either the weight of one member with the piecemark being referenced (if this line is the first line of a member detail's bill of material), or the weight of an individual piece of submaterial (if this line is a subsequent line of a member detail's bill of material).
How weight is calculated depends on whether the choice made to the setup option " Shop bill weight based on " is ' Volume ' or ' Length '. The weight is expressed in pounds or kilograms , depending on the primary dimension " Units ."
A "Unit Weight" column appears on this report when a " Print Order " is entered for " Unit Weight " in Bill of Material Layout .
Report Writer: BillOfMaterial.UnitWeight
Total Weight: Either the total weight of one member times the total number of members under this piecemark (if this line describes members), or the total weight of all pieces of this submaterial that make up one member times the total number of members under this piecemark.
A "Total Weight" column appears on this report when a " Print Order " is entered for " Total Weight " in Bill of Material Layout .
Report Writer: BillOfMaterial.TotalWeight
Remarks: Any text string , user-entered or a line from User Routing Configuration #4 that has been applied to the material.
If the " Print Order " for " Steel Grade ," and/or " Mult. Cutting # ," and/or " Labor Code ," and/or " Job Cost Code " and/or " Advance mill # " are set to ' Merge ' in Bill of Material Layout , the data for those fields associated with the selected member is automatically entered into this column (the "Remarks" column) of the report.
A "Remarks" appears on this report when a " Plot Order " is entered for " Remarks " in Bill of Material Layout . This is true even if other fields have been designated to ' Merge ' into the " Remarks " column.
Report Writer: BillOfMaterial.Remarks
Minor Mark: The submaterial piecemark of the submaterials described on this line. Since submaterial details are named after their submaterial mark , this is also the name of the submaterial detail.
A "Minor Mark" column appears on this report when a " Print Order " is entered for " Minor Mark " in Bill of Material Layout .
Report Writer: BillOfMaterial.MinorMark
Steel Grade: The steel grade of the material.
A "Steel Grade" column appears on this report when a " Print Order " is entered for " Steel Grade " in Bill of Material Layout .
Report Writer: BillOfMaterial.Grade
Mult. Cutting #: Any text string , user-entered or a line from User Routing Configuration #1 that has been applied to the material.
A "Mult Cutting #" column appears on this report when a " Print Order " is entered for " Plot Order " in Bill of Material Layout .
Report Writer: BillOfMaterial.MultCuttingNumber
Labor Code: Any text string , user-entered or a line from User Routing Configuration #2 that has been applied to the material.
A "Labor Code" column appears on this report when a " Print Order " is entered for " Labor Code " in Bill of Material Layout .
Report Writer: BillOfMaterial.LaborCode
Job Cost Code: Any text string , user-entered or a line from User Routing Configuration #3 that has been applied to the material.
A "Job Cost Code" column appears on this report when a " Print Order " is entered for " Job Cost Code " in Bill of Material Layout .
Report Writer: BillOfMaterial.JobCostCode
Sequence: The sequence assigned to the members (with this piecemark) whose quantity is reported in the "Sequence Quantity" column.
Members that are in different sequences may be assigned the same piecemark when the setup option " Break major marks apart by " is set to something other than ' Sequence ' or ' Zone '.
A "Sequence" column appears on this report when a " Print Order " is entered for " Sequence " in Bill of Material Layout .
Report Writer: BillOfMaterial.Sequence
Sequence Quantity: The number of members that have been assigned the sequence reported in the " Sequence " column.
A "Sequence Quantity" column appears on this report when a " Print Order " is entered for " Sequence Quantity " in Bill of Material Layout .
Report Writer: BillOfMaterial.SequenceQuantity
Advance Mill #: The ABM ID ( page-line or system ID).
A material can be assigned to a page and line in an ABM (" ABM Name ") by pressing " New " or " Update ABM " on the ABM Report window ( Modeling > Reports > Advanced Bill of Material ).
An "Advance Mill #" column appears on this report when a " Print Order " is entered for " Advance mill # " in Bill of Material Layout .
Note: It is possible for the member main material of different members that have the same member piecemark to be assigned different ABM page-line numbers (or system IDs). If this happens, the lowest page-line number is referenced here.
Report Writer: BillOfMaterial.ABMNumber
Member and material edit windows: ID
page 1 | contents | home > reports > system reports > bill of material | reports > | top
How to output a Bill of Material Plot Order by Detail :
The data columns in this report are exactly the same those in a newly placed bill of material that uses the same " Plot Order " settings from Bill of Material Layout .
1 . Before output of the report(s):
1a : Configure the columns that appear on this report (and the order in which they appear) by assigning items a " Plot Order " in Bill of Material Layout . Example : You can configure the report to tell you how many submaterial pieces (designated by a minor mark) are required to fabricate a particular shipping member (designated by a major piecemark), the unit weight of each submaterial, the total weight of each member, and also the material description.
1b : This type of report is compiled from the bills of material of members. Only a member that has been automatically detailed can generate a Bill of Material Plot Order by Detail . A warning message is generated listing members that you select which have not yet been detailed.
1c (optional) : You can Edit Bill to alter the information that will be compiled into this report for a particular member detail. However, do not auto detail the member after making these changes -- your alterations to the member's bill will be lost.
2 . Use any one (1) of the following methods to begin output of this report:
Method 1 : Home > Reports > System Reports > Bill of Material > Bill of Material Plot Order by Detail .
Method 2 : Click the Bill of Material Plot Order by Detail icon, which is pictured above. The icon can be taken from the group named ' Reports ' and placed on a toolbar (classic) or the ribbon (lightning). Ribbon configuration is done using Customize Interface .
Method 3 : If " Modeling layout style " or " Drawing Editor layout style " is ' Classic ', you can use the menu system to choose Reports > Bill of Material Plot Order by Detail .
3 . A selection dialog opens. On it is a list of those member details in your current Job that are up to date and therefore not marked for detailing .
|
You can use the listing options " Hide ... " and " Show All " to adjust which classes of members are shown on the selection list. " Destination " can be used to temporarily redirect where the report will be output. |
Alternative 1 : Select the member details you want separate reports to be compiled from, then press " OK. " Go to step 4.
Alternative 2 : Press " Cancel " to end this operation without outputting the report(s). Do not continue.
4 . A Bill Plot Reports is output for each member detail that you selected.
Note 1: If you selected members that have not yet been detailed, you get a warning with a list of those not-yet-detailed members. A report is not generated for any of those members.
Note 2: If you output the reports to the report viewer (" Screen "), you can now review the reports on screen then optionally print them or output them to disk (see report viewer ).
page 1 | contents | home > reports > system reports > bill of material | reports > | top